Web PBS Bidder Guide 22.7
![]() |
Clear Schedule and Start Next Bid Group and Else Start Next Bid Group are taken into consideration with Coverage Awards. If the PBS Scheduler cannot honor a bid preference with an Else Start Next Bid Group option due to a Coverage Award it will move to the next bid group. Also, the PBS Scheduler will move to the next bid group if a Clear Schedule and Start Next Bid Group bid is present and a pairing is awarded through Coverage Awards using the system-generated Award Pairings bid. |
The PBS Bidder interface will not allow the following bids to be submitted in Consecutive reserve.
This bid cannot be submitted because the first Pairings bid group does not contain an exit condition. 1. Start Pairings 2. Set Condition Maximum Credit 3. Prefer Off Mar 23,2012, Mar 25,2012, Mar 24,2012 4. Avoid Pairings If Departing On Between Mar 2,2012 and Mar 9,2012 5. Award Pairings If Departing On Monday, Tuesday Award Pairings 6. Start Pairings 7. Prefer Off Mar 9,2012, Mar 10,2012 8. Award Pairings If Departing On Mar 2,2012 Award Pairings Start Pairings Award Pairings Award Line Reserve Start Reserve |
This bid cannot be submitted because the first Reserve bid group does not contain an exit condition. 1. Start Pairings 2. Award line reserve Start Pairings Award Pairings Award Line Reserve Start Reserve 3. Start Reserve 4. Prefer Off Mar 16,2012, Mar 19,2012 4. Start Reserve 5. Prefer Off Mar 15,2012, Mar 17,2012, Mar 18,2012 Start Reserve
|